| Area of Illumination - Class A |
150 mm x 150mm up to modular 3x2 array sizes |
15 mm diameter (Circular spot) |
Will my Device Under Test (DUT) increase in size as my research progresses? |
| Area of Illumination - Class A+ |
100 mm x 100mm up to modular array sizes |
TODO build field |
TODO build field |
| Spectral Range |
350 nm – 1200 nm |
350 nm -1000 nm |
Do I need UV photons starting at 300 nm or NIR coverage beyond 1100 nm, or will the power in these areas be sufficient? |
| Spectral Control |
Yes - 32 channels full spectrum control |
Yes - 12 Channels |
Will I need to simulate AM1.5G, AM0, or custom conditions? |
| IEC 60904-9 Compliance |
Class A+A+A+ |
Class AAA |
Do I need certified, high-accuracy performance across all IEC categories? What problems will I have with lower Class uniformity performance? |
| Spectral Coverage |
<98% |
TODO |
100% is ideal |
| Spectral Deviation |
<27% |
TODO |
0% is ideal. How closely does the spectrum need to match real sunlight for my application? |
| Spectral Match |
< ±9% |
A |
How much spectral mismatch can my application tolerate before it affects measurement accuracy or material performance? |
| Long-Term Temporal Stability |
<1% |
A |
How sensitive are my experiments to light stability over time? |
| Spatial Uniformity |
<0.8% |
A |
Do I need consistent irradiance over the full sample surface? Could spatial variation compromise my data? |
| Lifetime |
25,000+ hours |
~10,000 hours |
How much downtime or recurring cost can I afford? What are the cost of bulb replacements? How many bulbs per year will I need? |
| Software & API |
Yes - Modern GUI and Python API included |
Ossila Solar Simulator Console software |
Will I need automation, scripting, or lab instrument integration? Will I need to run scripts across multiple instruments? |
| Maintenance |
No consumables; No alignment needed; |
Low maintenance |
How much downtime or recurring cost can I afford? What are the cost of bulb replacements? How many bulbs per year will I need? |
| System Footprint |
33cm x 33 cm x 50 cm. Both base and illumination head are 25 cm tall |
TODO build field |
TODO build field - Does my setup require space efficiency? |
| Price Point |
<$100/cm² |
~ 169.00/cm² |
Does the price reflect full system capability and long-term value? Will I need to upgrade or maintain later? |